Bathroom remodel

Custom tile shower

Loc Vermilion, OH Scope Shower remodel Time 3 weeks

Built from the studs out with a fully bonded waterproof substrate — large-format gray tile, mosaic niche, and pebble floor.

Completed custom tiled shower with pebble floor and matte black fixtures

About this project

This shower was built the right way, start to finish: a fully bonded, waterproofed substrate before a single tile went up, so the finished work is built to last.

The finished shower pairs large-format gray wall tile with a mosaic accent niche and a textured pebble floor — a durable, custom result that started as bare framing.

Start a similar project

The build

How this job moved from first photo to finished room.